Liam Fox attacks Labour's failure of Britain's armed forces
This was the Opposition Day Motion proposed yesterday by Liam Fox:
"That this House expresses its continued support for HM armed forces personnel and their families; notes that over 440 service personnel have been killed on operations in Iraq and Afghanistan since 2001; further notes that the armed forces have operated over the original planning assumptions for years; regrets that there has not been a Strategic Defence Review (SDR) since 1998; believes that the 1998 SDR was never fully funded and failed to provide proper equipment for the Iraq war; recognises that the Government failed to plan for post-conflict reconstruction in Iraq; further recognises the cut to the helicopter budget by £1.4 billion in 2004; is concerned about the cuts to the frigate and destroyer fleet from the 32 recommended in the 1998 SDR 10 to 23; is further concerned by the failure to provide the Royal Air Force with a modern troop transport and air-to-air refuelling fleet; believes that the Government has presided over a failed procurement process; further believes that the Government has failed properly to fund the armed forces for wartime operations; and calls on the Government to acknowledge its failure to honour the Military Covenant."
Cuts to the Royal Navy: "Time and time again since the 1998 SDR, the Navy has been blackmailed into accepting cuts to its fleet, to ensure the eventual addition of two new carriers. During the 1998 SDR process, the Navy agreed to cut its fleet of 12 attack submarines to 10, and its fleet of 35 destroyers and frigates to 32, in return for the promise of the two carriers. A decade later we find our Navy with only eight attack submarines, with a possible future reduction to only six or seven, and 22 -an astonishingly low number-of destroyers and frigates. Maritime commitments have not decreased since 1998 but have risen, at a time when our Navy has been slashed, mothballed and, in some cases, sold off. There is a similar pattern to be found across all three services, including the reserves."
Inadequate preparation for Iraq war: "The true story behind the invasion of Iraq is now being told. I am sure that the whole country is looking forward to the Prime Minister's evidence this Friday, but what we already know is quite shocking. Not only did the Government fail to plan properly for the post-conflict period in Iraq, but it is now well known that what most of us suspected all along is true: that troops were sent into Iraq without proper equipment. We now know that during the early planning phases of the Iraq war, the then Chief of the Defence Staff, Lord Boyce, was blocked by the then Defence Secretary from organising crucial logistics, in case it sent the wrong political message: that we were preparing for war. In the words of Lord Boyce, "I was not allowed to speak, for example, to the Chief of Defence Logistics-I was prevented from doing that by the Secretary of State for Defence, because of the concern about it becoming public knowledge that we were planning for a military contribution which might...be...unhelpful in the activity...in the United Nations to secure" a Security Council resolution."
Procurement failures: "According to the most recent figures available from the National Audit Office, the top 15 major procurement projects are £4.5 billion over budget and delayed by a total of 339 months. The A400M aircraft is £657 million over budget and will be delayed by 82 months. The Type 45 destroyer is £1.5 billion over budget and will be delayed by 38 months. The aircraft carriers are more than £1 billion over budget already, and the service entry date for the first carrier has been delayed from 2012 to 2016. The decision in 2004 to cut the helicopter budget by £1.4 billion-in the middle of two wars-was inexcusable, irresponsible and irreconcilable with the basic duty to maximise the safety of our troops while carrying out a dangerous mission. In the words of the former Defence Secretary, the right hon. Member for Ashfield, to the Chilcot inquiry, "had that budget been spent in the way that we thought we should spend it, then those helicopters would probably be coming into service any time now.""
Waste and wrong priorities: "The Ministry of Defence's record of waste is staggering, as £2.5 billion has been spent on external consultants, but it could not find £20 million to train the Territorial Army. Furthermore, £2.3 billion was spent refurbishing the MOD, but it could not find £4 million for officer training corps training. A further £6.6 billion was wasted on account of lost equipment, including among other things 3,938 Bowman radios and an untold number of laptops. Another £113 million was wasted on a super hangar for fast jet repair that was never used, while £118 million was wasted on armoured vehicle cancellations, £8 million was lost on cancelled training courses and almost £250,000 lost on works of art to hang on the walls of main building. How can all that be allowed to happen? It is a picture of serial incompetence and a lack of grip by Ministers on the Department."
Comments